글 목록

프로필

내 사진
서울 서초구 반포대로 14길 30, 센추리 412호. TEL: 010-6350-1799 이메일:jawala.lee@gmail.com. Attorney at Law, Tax, Patent. Lee,Jae Wook is a member of the Korean Bar Association and Illinois Bar Association. Licensed to practice in KOREA and U.S.A., Illinois. Attorney Lee has worked since 1997.3. as a prominent Attorney in the legal service field including tax, law, patent, immigration, transaction across the border. You can find more at http://taxnlaw.co.kr

2013년 4월 29일 월요일


scaf·fold  (skfld, -ld)
n.
1. A temporary platform, either supported from below or suspended from above, on which workers sit or stand when performing tasks at heights above the ground.
2. A raised wooden framework or platform.
3. A platform used in the execution of condemned prisoners, as by hanging or beheading.
tr.v. scaf·fold·edscaf·fold·ingscaf·folds
1. To provide or support with a raised framework or platform.
2. To place on a raised framework or platform.

[Middle English, from Medieval Latin scaffaldusof Old French origin.]
The American Heritage® Dictionary of the English Language, Fourth Edition copyright ©2000 by Houghton Mifflin Company. Updated in 2009. Published by Houghton Mifflin Company. All rights reserved.

scaffold [ˈskæfəld -fəʊld]
n
1. (Miscellaneous Technologies / Building) a temporary metal or wooden framework that is used to support workmen and materials during the erection, repair, etc., of a building or other construction
2. a raised wooden platform on which plays are performed, tobacco, etc., is dried, or (esp formerly) criminals are executed
vb (tr)
1. to provide with a scaffold
2. to support by means of a scaffold
[from Old French eschaffaut, from Vulgar Latin catafalicum (unattested); see catafalque]
scaffolder  n
Collins English Dictionary – Complete and Unabridged © HarperCollins Publishers 1991, 1994, 1998, 2000, 2003

scaf•fold (ˈskæf əld, -oʊld) 

n.
1. a platform or framework for raising workers and materials during the erection, repair, or maintenance of a building or the like.
2. an elevated platform on which a criminal is executed, usu. by hanging.
3. any raised platform or stage.
4. any supporting framework.
v.t.
5. to furnish with a scaffold or scaffolding.
6. to support by or place on a scaffold.
[1300–50; Middle English scaffot, skaffaut, scaffalde < Old French escadafaut; akin to catafalque]
Random House Kernerman Webster's College Dictionary, © 2010 K Dictionaries Ltd. Copyright 2005, 1997, 1991 by Random House, Inc. All rights reserved.
Thesaurus Legend:  Synonyms Related Words Antonyms
Noun1.scaffold - a platform from which criminals are executed (hanged or beheaded)scaffold - a platform from which criminals are executed (hanged or beheaded)
instrument of execution - an instrument designed and used to take the life of a condemned person
platform - a raised horizontal surface; "the speaker mounted the platform"
2.scaffold - a temporary arrangement erected around a building for convenience of workers
scaffoldingstaging - a system of scaffolds
arrangement - an orderly grouping (of things or persons) considered as a unit; the result of arranging; "a flower arrangement"
Verb1.scaffold - provide with a scaffold for support; "scaffold the building before painting it"
hold upsupportsustainhold - be the physical support of; carry the weight of; "The beam holds up the roof"; "He supported me with one hand while I balanced on the beam"; "What's holding that mirror?"
Based on WordNet 3.0, Farlex clipart collection. © 2003-2012 Princeton University, Farlex Inc.

scaffold
noun gallowsblockgibbet He ascended the shaky ladder to the scaffold.
Collins Thesaurus of the English Language – Complete and Unabridged 2nd Edition. 2002 © HarperCollins Publishers 1995, 2002
 Translations
Select a language:  -----------------------  

scaffold (ˈskӕfəldnoun
a raised platform especially for use formerly when putting a criminal etc to death.
ˈscaffolding noun
an erection of metal poles and wooden planks used by men at work on (the outside of) a building.
Kernerman English Multilingual Dictionary © 2006-2013 K Dictionaries Ltd.


Scaffolding

From Wikipedia, the free encyclopedia
Bamboo scaffolding in Hong Kong
condominium in periodical (every 10-15 years) large scale repairing/maintenance in Japan under regulation. In most cases the entire building is covered by steel scaffolding and mesh for easy work and safety. Typically it continues 3-5 weeks per planned schedule.
Scaffolding, 10 months after Tokyo Skytree construction start
Scaffolding is a temporary structure used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes or tubes, although it can be from other materials. Bamboo is frequently used in Asia.[1]

Contents

  [hide

[edit]In the ancient world

The Berlin Foundry Cup depicts scaffolding in ancient Greece (early 5th century BC). The ancient Egyptians, Nubians and Chinese are also recorded as having used scaffolding-like structures to build tall buildings.

[edit]In the modern day

This European Standard specifies performance requirements and methods of structural and general design for access and working scaffolds. Requirements given are for scaffold structures that rely on the adjacent structures for stability. In general these requirements also apply to other types of working scaffolds.
The purpose of a working scaffold is to provide a safe place of work with safe access suitable for the work being done. This document sets out performance requirements for working scaffolds. These are substantially independent of the materials of which the scaffold is made. The standard is intended to be used as the basis for enquiry and design.
Thus the requirements of BS EN 12811-1. TG20 is largely based on BS 5973 with extracts taken directly from the old code, it also uses permissible stress design method. However, TG20 received a mixed response from the UK industry and as a result TG20 is being re-written and the new version is due for release sometime in 2008. This is the reason for the 'limbo' situation. Until the release of the revised TG20 the HSE continue to allow scaffold to be built in accordance with BS 5973.[2][clarification needed (technical jargon)]

[edit]Materials

The basic components of scaffolding are tubes, couplers and boards.
Extensive scaffolding on a building in downtown Cincinnati, Ohio. This type of scaffolding is called pipe staging.
Assembly of bamboo scaffolding cantilevered over a Hong Kong street
The basic lightweight tube scaffolding that became the standard and revolutionised scaffolding, becoming the baseline for decades, was invented and marketed in the mid-1950s. With one basic 24 pound unit a scaffold of various sizes and heights could be assembled easily by a couple of labourers without the nuts or bolts previously needed.[3]
Tubes are usually made either of steel or aluminium, although there is composite scaffolding, which uses filament-wound tubes of glass fibre in a nylon or polyester matrix, because of the high cost of composite tube, it is usually only used when there is a risk from overhead electric cables that cannot be isolated. If steel, they are either 'black' or galvanised. The tubes come in a variety of lengths and a standard diameter of 48.3 mm. (1.5 NPS pipe). The chief difference between the two types of metal tubes is the lower weight of aluminium tubes (1.7 kg/m as opposed to 4.4 kg/m) and also their greater flexibility and so their lower resistance to force. Tubes are generally bought in 6.3 m lengths and can then be cut down to certain typical sizes. Most large companies will brand their tubes with their name and address in order to deter theft.
Boards provide a working surface for scaffold users. They are seasoned wood and come in three thicknesses (38 mm (usual), 50 mm and 63 mm) are a standard width (225 mm) and are a maximum of 3.9 m long. The board ends are protected either by metal plates called hoop irons or sometimes nail plates, which often have the company name stamped into them. Timber scaffold boards in the UK should comply with the requirements of BS 2482. As well as timber, steel or aluminium decking is used, as well as laminate boards. In addition to the boards for the working platform, there are sole boards which are placed beneath the scaffolding if the surface is soft or otherwise suspect, although ordinary boards can also be used. Another solution, called a scaffpad, is made from a rubber base with a base plate moulded inside; these are desirable for use on uneven ground since they adapt, whereas sole boards may split and have to be replaced.
A short section of steel scaffold tube.
Couplers are the fittings which hold the tubes together. The most common are called scaffold couplers, and there are three basic types: right-angle couplersputlog couplers and swivel couplers. To join tubes end-to-end joint pins (also called spigots) or sleeve couplers are used. Only right angle couplers and swivel couplers can be used to fix tube in a 'load-bearing connection'. Single couplers are not load-bearing couplers and have no design capacity.
Other common scaffolding components lnclude base plates, laddersropes, anchor ties, reveal ties, gin wheels, sheeting, etc. Most companies will adopt a specific colour to paint the scaffolding with, in order that quick visual identification can be made in case of theft. All components that are made from metal can be painted but items that are wooden should never be painted as this could hide defects. Despite the metric measurements given, many scaffolders measure tubes and boards in imperial units, with tubes from 21 feet down and boards from 13 ft down.
Bamboo scaffolding is widely used in Hong Kong, with nylon straps tied into knots as couplers.[4]

[edit]Basic scaffolding

The key elements of a scaffold are standardsledgers and transoms. The standards, also called uprights, are the vertical tubes that transfer the entire mass of the structure to the ground where they rest on a square base plate to spread the load. The base plate has a shank in its centre to hold the tube and is sometimes pinned to a sole board. Ledgers are horizontal tubes which connect between the standards. Transoms rest upon the ledgers at right angles. Main transoms are placed next to the standards, they hold the standards in place and provide support for boards; intermediate transoms are those placed between the main transoms to provide extra support for boards. In Canada this style is referred to as "English". "American" has the transoms attached to the standards and is used less but has certain advantages in some situations. Since scaffolding is a physical structure, it is possible to go in and come out of scaffolding.
Scaffolding in Tretyakovsky Proyezd, Moscow
As well as the tubes at right angles there are cross braces to increase rigidity, these are placed diagonally from ledger to ledger, next to the standards to which they are fitted. If the braces are fitted to the ledgers they are called ledger braces. To limit sway a facade brace is fitted to the face of the scaffold every 30 metres or so at an angle of 35°-55° running right from the base to the top of the scaffold and fixed at every level.
Of the couplers previously mentioned, right-angle couplers join ledgers or transoms to standards, putlog or single couplers join board bearing transoms to ledgers - Non-board bearing transoms should be fixed using a right-angle coupler. Swivel couplers are to connect tubes at any other angle. The actual joints are staggered to avoid occurring at the same level in neighbouring standards.
Basic scaffold dimensioning terms. No boards, bracing or couplers shown
The spacings of the basic elements in the scaffold are fairly standard. For a general purpose scaffold the maximum bay length is 2.1 m, for heavier work the bay size is reduced to 2 or even 1.8 m while for inspection a bay width of up to 2.7 m is allowed.
The scaffolding width is determined by the width of the boards, the minimum width allowed[where?] is 600 mm but a more typical four-board scaffold would be 870 mm wide from standard to standard. More heavy-duty scaffolding can require 5, 6 or even up to 8 boards width. Often an inside board is added to reduce the gap between the inner standard and the structure.
The lift height, the spacing between ledgers, is 2 m, although the base lift can be up to 2.7 m. The diagram above also shows a kicker lift, which is just 150 mm or so above the ground.
Transom spacing is determined by the thickness of the boards supported, 38 mm boards require a transom spacing of no more than 1.2 m while a 50 mm board can stand a transom spacing of 2.6 m and 63 mm boards can have a maximum span of 3.25 m. The minimum overhang for all boards is 50 mm and the maximum overhang is no more than 4x the thickness of the board.

[edit]Foundations

Good foundations are essential. Often scaffold frameworks will require more than simple base plates to safely carry and spread the load. Scaffolding can be used without base plates on concrete or similar hard surfaces, although base plates are always recommended. For surfaces like pavements or tarmac base plates are necessary. For softer or more doubtful surfaces sole boards must be used, beneath a single standard a sole board should be at least 1,000 cm² with no dimension less than 220 mm, the thickness must be at least 35 mm. For heavier duty scaffold much more substantial baulks set in concrete can be required. On uneven ground steps must be cut for the base plates, a minimum step size of around 450 mm is recommended. A working platform requires certain other elements to be safe. They must be close-boarded, have double guard rails and toe and stop boards. Safe and secure access must also be provided.
Scaffolding showing required protection of a working platform with maximum dimensions. Butt-board not visible. No couplers shown

[edit]Ties

The Holy Trinity Church in Vladimir, with scaffolding wrapped in safety mesh.
Scaffolds are only rarely independent structures. To provide stability for a scaffolding (at left) framework ties are generally fixed to the adjacent building/fabric/steelwork.
General practice is to attach a tie every 4m on alternate lifts (traditional scaffolding). Prefabricated System scaffolds require structural connections at all frames - ie.2-3m centres (tie patterns must be provided by the System manufacturer/supplier). The ties are coupled to the scaffold as close to the junction of standard and ledger (node point) as possible. Due to recent regulation changes, scaffolding ties must support +/- loads (tie/butt loads) and lateral (shear) loads.
Due to the different nature of structures there is a variety of different ties to take advantage of the opportunities.
Through ties are put through structure openings such as windows. A vertical inside tube crossing the opening is attached to the scaffold by a transom and a crossing horizontal tube on the outside called a bridle tube. The gaps between the tubes and the structure surfaces are packed or wedged with timber sections to ensure a solid fit.
Box ties are used to attach the scaffold to suitable pillars or comparable features. Two additional transoms are put across from the lift on each side of the feature and are joined on both sides with shorter tubes called tie tubes. When a complete box tie is impossible a l-shaped lip tie can be used to hook the scaffold to the structure, to limit inward movement an additional transom, a butt transom, is place hard against the outside face of the structure.
Sometimes it is possible to use anchor ties (also called bolt ties), these are ties fitted into holes drilled in the structure. A common type is a ring bolt with an expanding wedge which is then tied to a node point.
Scaffolding by Balfour & Beatty during refurbishment of the Waverley Station roof, Edinburgh 2011
The least 'invasive' tie is a reveal tie. These use an opening in the structure but use a tube wedged horizontally in the opening. The reveal tube is usually held in place by a reveal screw pin (an adjustable threaded bar) and protective packing at either end. A transom tie tube links the reveal tube to the scaffold. Reveal ties are not well regarded, they rely solely on friction and need regular checking so it is not recommended that more than half of all ties be reveal ties.
If it is not possible to use a safe number of ties rakers can be used. These are single tubes attached to a ledger extending out from the scaffold at an angle of less than 75° and securely founded. A transom at the base then completes a triangle back to the base of the main scaffold.

[edit]Specialty scaffolding

[edit]Putlog scaffold

In addition to the putlog couplers (discussed above, there are also putlog tubes. These have a flattened end or have been fitted with a blade. This feature allows the end of the tube to be inserted into or rest upon the brickwork of the structure.
A putlog scaffold may also be called a bricklayer's scaffold. As such, the scaffold consists only of a single row of standards with a single ledger. The putlogs are transoms - attached to the ledger at one end but integrated into the bricks at the other.
Spacing is the same on a putlog scaffold as on a general purpose scaffold, and ties are still required. In recent years a number of new innovations have meant an increased scope of use for scaffolding, such as ladderbeams for spanning spaces that cannot accommodate standards and the increased used of sheeting and structure to create temporary roofs.

[edit]Pump-jack

A pump-jack is type of portable scaffolding system. The scaffold rests on supports attached to two or more vertical posts. The user raises the scaffolding by pumping the foot pedals on the supports, like an automobile jack. For U.S. requirements and guidelines on pump-jacks – including a diagram – see the U.S. Department of Labor website.

[edit]Standards

The widespread use of scaffolding systems, along with the profound importance that they earned in modern applications such as civil engineering projects and temporary structures, led to the definition of a series of standards covering a vast number of specific issues involving scaffolding. Among the standards there are:[5]

[edit]See also

[edit]References

이 블로그 검색